Project Details
Location: New Zeland
Year: 2010
Project Description
Working contest
The pond is on a drilling rig site. The rig is used for Geo-thermal power exploration.
The Problem
Pumping heavy slurry: bentonite, geo-thermal minerals, drilling fluid, sand, pumice. Performance of sucker trucks where unsatisfactory.
Our solution
Dragflow HY50 driven by a 13 Ton CAT digger. Spray ring / HH80 Sykes Pump. The unit out performed traditional method of using sucker trucks. Using sucker trucks 2 weeks, Dragflow Pump 4 Days , 70% less time consumption and costs.