• 2166 Zeus Court Bakersfield, CA 93308, USA

CSR POLICY – PROJECT III

MODY PUMPS CSR POLICY

OVERVIEW – MAKING DIFFERENCE:

To ensure CSR remains an ongoing activity, MODY PUMPS strongly believes that corporates who benefit from the society must give back to the society, that an organization with the power to affect human lives must use the power wisely.Taking these practices forward, our Managing Director Mr. Nagaraja R. Bhat institutionalized the concept of community work is a way of telling the people among whom we operate that We Care.

OUR STRATEGY:

 

As a responsible corporate entity of India, MODY PUMPS has already completed CSR activities Desilting and Deepening of village tank at- Chon, Tal – Ambernath under the guidance of Tahsildar, Ambernath against Mahatma Gandhi Rashtriya Grameen Rojgar Hami Yojana – Government of Maharshtra and Project at CHIRANTHANA CHARITABLE TRUST (R ) Suratkal), home for Geriatric Health Care,consists CCTV system covering entire old age home, Store and living room for staff,Aatra oven for hot water,EPBX system and 250Ltr. Boiler.

Our vision is to actively contribute to the social and economic development of the communities by the way of life for weaker section of society, home for the aged, disabled, dying destitute, Orphaned Children, unwedded mothers and raise country’s human development index. As a part of above vision, we identified the following activities to be undertaken as CSR activities under its CRS policy either on its own or indirectly through charitable trust or the association contributing to the society.

IDENTIFICATION MECHANISM OF PROJECT:

Accordingly, we selected ST.PAUL’S JEEVAN DARSHAN SANSTHA,At Post Uttan, P.O. Box No.1, Uttan-401 106, DhavgiDongri, Bhayander (West), Dist. Thane, Maharashtra, Indiahome for the Dying destitute,Orphaned children and unwedded mothers looking after for nearly 20 years at Uttan

PROJECT OPERATIONS:

As a request from managing trustee of ST.PAUL’S JEEVAN DARSHAN SANSTHA, the projects which are very much useful by constructing Stone compound wall to protect the heavy influx of poisonous reptiles into their habitat area as home is located nearby heavy forest. For the smooth running of their habitat area and to avoid causing bites and death to their mates following requirements are needed& implemented.

Construction of compound wall as per following specification:

Construction with White Stone, river sand and reputed brand cement or ACC Cement.

8mm steel to be used for coping, Compound height 5ft from ground level and 1.5 ft under the ground with 6” coping

 

SUSTAINABILITY OF THE PROJECT:

It is done and maintained by ST.PAUL’S JEEVAN DARSHAN SANSTHA.

L

Read More

CSR POLICY – PROJECT II

MODY PUMPS CSR POLICY

OVERVIEW – MAKING DIFFERENCE:

To ensure CSR remains an ongoing activity, MODY PUMPS strongly believes that corporates who benefit from the society must give back to the society, that an organization with the power to affect human lives must use the power wisely.Taking these practices forward, our Managing Director Mr. Nagaraj Uppunda institutionalized the concept of community work is a way of telling the people among whom we operate that We Care.

OUR STRATEGY:

As a responsible corporate entity of India, MODY PUMPS has already completed CSR activities Desilting and Deepening of village tank at- Chon, Tal – Ambernath under the guidance of Tahsildar, Ambernath against Mahatma Gandhi Rashtriya Grameen Rojgar Hami Yojana – Government of Maharashtra. Our vision is to actively contribute to the social and economic development of the communities by the way of life for weaker section of society, home for the aged and disabled and raise country’s human development index. As a part of above vision, we identified the following activities to be undertaken as CSR activities under its CRS policy either on its own or indirectly through charitable trust or the association contributing to the society.

IDENTIFICATION MECHANISM OF PROJECT:

Accordingly, we selected CHIRANTHANA CHARITABLE TRUST ( R), home for Geriatric Health Care, IDYA, Surathkal, D.K. 575014. Which has been operative for the last 20 years by running a home for senior citizens. Presently serving 45 aged and disabled along with geriatric care along with serving communities health, education and cultural promotion having remarkable service regarding old people.

PROJECT OPERATIONS:

As a request from managing trustee of CHIRANTHANA CHARITABLE TRUST (R), The projects which are very much useful for the smooth running of their organization, following requirements are needed& implemented.

  1. CCTV system Covering entire old age home.
  2. Make shift structure at the roof top to facilitate a store room and living room for the employees.
  3. Aatra Oven
  4. EPBX (Intercom system)
  5. 250 Ltr. Boiler for providing hot water to the residents.

SUSTAINABILITY OF THE PROJECT:

It is done and maintained by CHIRANTHANA CHARITABLE TRUST (R).

Read More

CSR POLICY – PROJECT I

MODY PUMPS CSR POLICY

OVERVIEW – MAKING DIFFERENCE:
With regard to CSR, this means investing part of our profits beyond business, for the larger
good of society. Taking these practices forward, our Managing Director Mr. Nagaraj
Uppunda institutionalized the concept of community work is a way of telling the people
among whom we operate that We Care.

OUR STRATEGY:
Our main focus is on the all-round development of the communities around our plants
located mostly in nearby rural areas and tribal belts in MIDC area of Ambernath. MH.
Accordingly, we selected Desilting and Deepening of village tank at- Chon, Tal – Ambernath
under the guidance of Tahsildar, Ambernath against Mahatma Gandhi Rashtriya Grameen
Rojgar Hami Yojana – Government of Maharshtra., vide letter ref. no. 191/2017 dt.
21.06.2017 received from Tahsildar office, Ambernath.

IDENTIFICATION MECHANISM OF PROJECT:
Projects are planned in a participatory manner, in consultation with the authority, Tahsildar
office, Ambernath. literally sitting with them, and gauging their basic needs. Subsequently,
based on a consensus and in discussion with the Tahsildar , we prioritize requirements
which needed by villagers. Thus a project is born and Implementation is the responsibility of
the Deputy Engineer, Minor irrigation (Z.P.) Sub division Ambernath under the leadership of
Tahsildar. 

PROJECT OPERATIONS:
Desilting and Deepening of Village Tank At- Chon, Tal – Ambernath.
Removing wet silt from canal bed with 15.00 mtr. Lead and 1.05 mtr. Including depositing
the excavated stuff as directed by Deputy Engineer, Minor irrigation (Z.P.) Sub division
Ambernath.

SUSTAINABILITY OF THE PROJECT:
It is done and maintained by Deputy Engineer, Minor irrigation (Z.P.) Sub division
Ambernath as per letter ref. no. 191/2017 dt. 21.06.2017.

Read More
PUMP SELECTOR